Birmingham University train station is undergoing redevelopment, which requires a series of 29-hour closures of the canal and towpath. This is to enable large sections of the station building framework and canal footbridge to be lifted across the canal. The stoppages will be between 00.30 on Sundays and 05.00 on Mondays on the following dates: 27th – 28th June; 4th – 5th July; 8th – 9th August; 5th – 6th September; 26th – 27th September; and 3rd – 4th October. To minimise the effect of the closures, there will be two windows in which the canal will be opened to allow boats to pass through the site. These will be 12.00-13.00 and 16.00-17.00 on each Sunday.